Commercial furniture installation in Singapore

Have the workspace ready when opening day arrives.

Bai & Boey Furniture Set Up assembles office furniture around your access rules, trading hours and fit-out schedule. We work with offices, coworking spaces, clinics, tuition centres, retail shops, cafés and serviced apartments.

Plan the work in phases. Keep the date.

scheduleEvening and weekend windows view_weekBulk, phased installation fact_checkDocumented handover

For a fixed opening date: share your site location, target handover, furniture list and any loading or lift booking rules.

New Singapore office with aligned workstations, ergonomic chairs and assembled storage ready for staff

Different sites, planned installations

Sectors we install for

Each space has its own access and handover needs. We plan the furniture layout and assembly sequence around how the site will be used.

business_center

Offices and startups

Desks, benching, monitor arms, seating and storage set out for the team.

Single rooms or full office floors
groups

Coworking spaces

Hot-desking systems, lockers, phone booths and breakout furniture.

Shared spaces and repeat desk bays
medical_services

Clinics and tuition centres

Consultation desks, waiting-area seating and cabinetry for daily use.

Reception, teaching and treatment rooms
storefront

Retail shops

Counters, shelving and display units assembled for a clear customer route.

Shop floor and back-of-house storage
local_cafe

Cafés and hospitality

Dining furniture, service-area storage and guest-facing pieces.

Install around service hours where arranged
apartment

Serviced apartments and schools

Room furniture, wardrobes, learning-area seating and shelving.

Repeatable room-by-room setup

Office desk installation

Workstations, benching and cable management

Consistent alignment matters across a shared run. We assemble desks and benching in sequence, then check levels and spacing before handover.

  • check_circleIndividual desks and continuous benching aligned across each row.
  • check_circleCable trays, grommets and under-desk channels fitted where the furniture design allows.
  • check_circleMonitor arms and screen mounts fitted only within the desk's stated specification and weight limit.
  • check_circleHeight and spacing checked across the bench run for an even finish.
Before work starts: provide the desk model or assembly instructions so we can check mounting requirements.
Rows of assembled office benching with fitted cable trays and aligned ergonomic chairs in a bright Singapore workspace

New fit-outs, expansions and relocations

Bulk installation with a clear sequence

We coordinate furniture work with your project contact and other trades. A phased plan can make completed areas usable before the full installation ends.

01

Map the site

Confirm furniture quantities, floor access, delivery points, lift bookings and the target handover date.

02

Set the phases

Agree the room or floor sequence with your fit-out contact, electricians and network cabling team.

03

Install and record

Assemble by agreed batch, share progress updates and note completed items or parts still outstanding.

A tidy, documented handover

Quality checks and site conduct

We follow the site process you agree with us and record issues that need supplier action.

fact_check

Before we hand over

  • check_circleInstaller identification and site sign-in follow your building's procedures.
  • check_circleStability, alignment and moving parts are checked after assembly.
  • check_circleMissing or damaged components are recorded so your team can follow up with the supplier.
  • check_circleCompleted items and outstanding work are listed in the project handover notes.
rule

Clear work boundaries

Furniture assembly does not include electrical, plumbing or network termination. Those specialist works must be completed by the appropriate licensed contractors.

Share the site sequence with us so furniture installation can follow their work safely.

Planning the project

Commercial project questions

Clear details early make the installation plan more useful.

How far ahead should we book a fit-out installation?

Contact us as soon as you have a target handover date and an initial furniture list. Timing depends on project size, site access and the installation windows available.

Can work be split across several nights?

Yes. We can discuss phased evening or weekend work so the sequence fits your operating hours and site access arrangements.

Can you assemble furniture from multiple suppliers?

Yes. Include each supplier's item list and assembly instructions with your enquiry. We can plan the batches and flag any unclear or missing components.

What happens if parts are damaged or missing?

We note the affected item and component in the handover record, then your team can request replacements from the supplier. The agreed plan can show any work that must wait for those parts.